With a very successful ABTT theatre show in London and Cinema Expo convention in
Amsterdam behind us, we've stepped into the second half of 2008 and at the same time
into the next 5 years of Alcons "growth of something beautiful".
The past five years turned out to be much more than just proving our reason for
existence in this seemingly crowded market, with a surprisingly fast expansion of
"Alcons pro-ribbon ambassadors" around the globe. "The best is yet to come", so
we're shifting Alcons into the next gear, with increased investments in R&D, support
and partnerships!
The LR14/90 ultra-compact pro-ribbon line-array is now shipping; Identically
equipped as the LR14/120, but now with the 800W RBN401 pro-ribbon HF driver on
90-degree Alutec™ wave-guide, the LR14/90 is designed for (even) longer throw and
controlled projection in more narrow applications. Very precise projection and
throw control in combination with HiFi at concert SPL's.
Alcons' amplifier Digital Drive Processor™ module has received upgraded V1.5
firmware, with a range of new settings and features; LR14/90 line-array presets
(a.o. array-length optimisation, stacked/flown configuration); BF181/362 subwoofer
presets with selectable response settings ("sub", "bass" and "punch"); Cardiod
subwoofer presets and futher optimized phase-responses.
Over 6 months underway (and running!), with around 400.000 tickets sold, Ciske de
Rat - the musical is the most successful travelling Dutch musical ever. At the
recent Musical Awards Gala 2008, this musical scored another record with 7 awards
out of the 13 nominations. Not surprising then that this production is touring
with an Alcons LR14 line-array system, with BF sub's and powered/controlled by
Amplified Loudspeaker Controllers.
In Austria, the event dome of the international headquarters of Red Bull, called
"Hangar 7", received a state-of-the-art sound system, with semi-permanent Alcons
QR36 5m. line-source columns on purpose-designed stands; Powered and controlled by
ALC's, with Trinnov outboard optimizing processing. Total project design and
realization by Pro Performance of Austria.
A large number of LR14 and LR14B line-array systems were recently installed in
Malaysia's Tertutup stadium. The indoor stadium, located in Kuala Terengganu, was
finished just in time for the Sukan Malaysian ("SUKMA") Games 2008. No less than
14 arrays, driven by same number of ALC2 Amplified Loudspeaker Controllers with
SDP processing and Dolby Lake system control. Total project design and realization
by Hybrid Junction of Malaysia.
Other recent projects include: Buddha Bar Beirut Lebanon, Hamburg's Thalia Theater
and Schmid's Tivoli, Volkswagen car manufacturer Dresden, Fraunhofer Institute
Germany, Pathé Cinema group, Landestheater St.Pölten Austria, to name just a few.